Enterprise AI Infrastructure & Regional Cloud

TATC
AI Infrastructure for the Region

Unified Token API gateway and dedicated bare-metal GPU compute — powered by regional Tier III data centres with 99.9% uptime SLA and enterprise data sovereignty.

99.9% Uptime SLA
Multi-Model API Gateway
Dedicated Bare-Metal Fleet
Regional Sovereign Cloud

Workloads We Power

From high-concurrency real-time inference to heavy-duty multi-modal rendering — robust infrastructure engineered for demanding enterprise workloads.

Real-Time Video Stream Inference
AIGC Image & Video Rendering
Multi-Language LLM Inference
Interactive Digital Avatar AI
Multi-Modal Data Analytics
Fine-Tuning & Model Adaptation

Why Choose TATC

Three numbers that define the platform.

99.9%
UPTIME SLA

Contracted availability across the Token API and bare-metal fleet, backed by enterprise SRE support.

1
UNIFIED MULTI-MODEL API

Access leading multi-modal foundation models through a single OpenAI-compatible API endpoint with unified billing.

100%
DEDICATED PHYSICAL ISOLATION

High-density single-tenant bare-metal GPU servers delivering raw compute power, direct hardware pass-through, and zero virtualization overhead.

Data Centre Expansion

Four-Stage DC Expansion Roadmap

From today's Tier III regional site to a 100MW-class sovereign AI cloud — a deliberate four-stage build-out that keeps the Token API and bare-metal fleet ahead of regional demand.

  1. 01Contracted · 195 kW

    Operational Validation

    A signed colocation arrangement at True IDC East Bangna. Facility preparation and rack-area retrofit are in progress; compute equipment has not yet been installed.

    • Agreement signed with True Internet Data Center Co., Ltd.
    • 13 × 15 kW contracted rack capacity
    • Facility retrofit and deployment preparation in progress
    View facility details
  2. 02February 2027 · 7.5MW

    Proprietary Launch

    Planning a proprietary data centre concept with a 7.5 MW power goal and high-density modular air-cooled server rooms.

    • 7.5MW self-built data centre
    • High-density green air-cooled architecture
    • Expanded enterprise tenant capacity
    View planning concept
  3. 03August 2027 · 20MW

    Modular Scale-Up

    Rapid scale-up via modular containerized units, delivering large-scale GPU deployment to power region-wide AI workloads.

    • 20MW containerized scale-up capacity
    • Rapid-deployment modular units
    • Cross-region enterprise workload support
  4. 042028 Onward · 100MW

    Regional Sovereign Cloud

    Ultra-scale regional sovereign AI cloud ecosystem offering end-to-end data centre services and strict in-region data residency.

    • 100MW-class regional sovereign AI ecosystem
    • In-region data residency & sovereignty
    • End-to-end enterprise data centre services

Roadmap targets are subject to financing, permits, power availability, vendor allocation and final engineering design.

Ready to Start Building?

Talk to our team about Token API access or dedicated bare-metal capacity — hosted in our regional data center.